BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Home > China Small EPC Contractor - Quotation on GE LM2500 Gas Turbine genset power plant project


Google

Quotation on GE LM2500 Gas Turbine genset power plant project

Thanks for your invitation to our company to offer this commercial offer for your project of SCOPE OF PROJECT AND EQUIPMENT FOR 1 (ONE) UNIT BRAND NEW OR REFURBISHED 20MW GAS TURBINEPOWER PLANT.

As one of the reputable EPC contractors in the world market of power generation and transmission projects, our EPC has finished reference of Gas turbine power plant projects, only name a few: Kabirwala 2XGE6B CCHP 135MW in Pakistan; 2XGE6B CCHP 135MW China; 4XGE9E CCHP 750MW in Angola; 2XGE9E CCHP 375MW in Bangladesh; 5XGETM2500 75MW in Angola. As to the limited information exchanged, we are offering our preliminary quotation to this mentioned project, if final scope of supply and on site data and other factors be informed, then we can offer your our final quotation through mutual understanding and negotiation.  

Item

Name

Unit in Set

1

GE LM2500 Gas Turbine genset with output 22MW/Unit, including main turbine, and auxiliary skid. The gas turbine for duel fuel of natural gas and diesel oil to Supplied by GE licensee.

1

2

Spare parts for 2 years

1

3

Power plant Auxiliaries: steel structure room, step-up station, power plant transformer, chemical water system.

1

4

installation and commissioning of supplied equipment and systems

1

5

Site Survey

1

6

Fob transportation and insurance

1

 SPAN lang=EN-US>Remarks:

 SPAN lang=EN-US>Total price:

1

Equipment supply, installation/commissioning delivery: about 1 year.

 SPAN lang=EN-US>

2

All tax and tariff, costs related to local port to site transportation not included.

 SPAN lang=EN-US>

3

Heavy machines such as crane, fork lift, should be supplied by Employer.

 SPAN lang=EN-US>

4

International travel, contractor’s staffs local living, boarding, security, visa, medical, insurance should be provided by employer.

 SPAN lang=EN-US>

5

Consumables during installation/commissioning/test should be provided by employer

 SPAN lang=EN-US>





Statement: Any reference to the OEM, part number or other OEM, information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]